Block paving cleaning at the hottest ride in the UK. After completion of the massive revamp of the Uks favourite roller coaster, the block paving walkwys and footpaths arounf the ride needed cleaning of construction mud and debris additionall the queing system for the ride with the footpaths and fencing also required cleaning. This was completed by our 4 man team 72 hours prior to the grand reopening of Nemesis. Some areas required steam cleaning.


